February 28, 2008
The cupola atop the Rehearsal Facility / Student Dorm is framed in by mid-morning before Thanksgiving.
|
Inside the Rehearsal Center, scaffolding rises to the top of ceiling, where windows, trim, and a fan are installed in the cupola. The lights have been installed, and cedar siding covers the walls around the top ring of windows.
|